Tuesday, October 23, 2012

Plumbing Waste

Today the plumbers were on-site to start the waste plumbing, septic and all of that.  The apprentice rang in sick which meant I was the apprentice for the day.  A successful day with the ensuite and kitchen being plumbed into the septic tank, that was also installed today (not going anywhere with 3000 litres of water in it).




Tomorrow the bathroom and laundry should be plumbed in, pump well installed and a good start made on the absorption trenches.  After that they should also start on the rainwater catchment.

In this process there will be a lot more soil moved around so the outside of the building will look different again.

No comments:

Post a Comment