Monday, October 29, 2012

Waste Plumbing

Last week saw the waste plumbing all but finished.  The only things left to do, is install the pump and the high level alarm.  The absorption trenches went in in the rain and Kylie was a little sad to see all the bush go.  However we now have a clean slate and can control what we want to grow back or plant - maybe.  The photo below is after the land was cleared but before the trenches went in.


I had a fun half day cutting slots in the pipe.  Needed 120m of slotted pipe so it was either pay the plumber to cut the slots or do it myself.

No comments:

Post a Comment